|
|
- Nonlinear
Seismic Evaluations of Castaic Intake Towers and Access Bridge. Report prepared for the California Department of Water Respources, Sacramento, California, September 15, 2017.
|
- Nonlinear
Static and Seismic Evaluations - Log Cabin Dam. Report prepared for Yuba County Water Agency, Marysville, California, February 1, 2017.
|
- Nonlinear
Static and Seismic Evaluations - Our House Dam. Report prepared for Yuba County Water Agency, Marysville, California, February 1, 2017.
|
- Nonlinear
Static and Seismic Evaluations - New Bullards Bar Dam. Report prepared for Yuba County Water Agency, Marysville, California, June 20, 2016.
|
- Nonlinear
Seismic Evaluation of Perris Dam Outlet Tower. Report prepared for the California Department of Water Respources, Sacramento, California, September 12, 2015.
|
- Static and Seismic
Evaluations of Swan Lake Dam for Current and Raised Water levels. Report prepared for the Southeast Alaska Power Agency, Ketchikan, Alaska, February 9, 2015.
|
- Linear and Nonlinear Seismic
Evaluations - Donnells Arch Dam. Report prepared for Tri-Dam Project, Strawberry, Tuolumne County, California, May 5, 2014.
|
- Guidelines
for Determination and Use of Reservoir Bottom Reflection Coefficient.
Research report to the US Army Corps of Engineers,
Waterways Experiment Station, Vicksburg, Mississippi, November 2003
|
- Finite-Element
Stability Analyses of Claytor Dam.
Report
to American Electric Power, Columbus, Ohio, June 2003
|
- Technical
Review and Analysis of Design Documentation Report (DDR), Folsom Dam
Outlet Modifications Project, American River Watershed.
Report
to the US Army Corps of Engineers, Headquarters, Washington D.C., May
2003
|
- Finite-Element
Structural Analyses of Hemlock Dam.
Report to the US Army Corps of Engineers, Portland
District, February 2003
|
- Linear
and Nonlinear Finite-element Analyses of Claytor Dam. Report
to American Electric Power, Columbus, Ohio, September 2002
|
- Independent
Technical Review, Folsom Mini-Raise Project, American River Watershed,
Long-Term Study, California. Report
to the US Army Corps of Engineers, Headquarters, Washington D.C., November
2002
|
- Time
History Dynamic Analysis of Smithland Dam. Report
to Smithland Hydroelectric Partner, Ltd., Bethesda, Maryland, June 2002
|
- Static
Stability of Smith Mountain Dam. Report
to American Electric Power, Columbus, Ohio, September 2001
|
- Time
History Seismic Evaluation of Walters Dam.
Report to ARCADIS Geraphty & Miller, Chattanooga,
Tennessee, February 2000
|
- Measurement
and Prediction of Dam-Water-Foundation Interaction at Longyangxia Dam.
Final
report to the US National Science Foundation on Research Conducted Under
the US-China Protocol for Scientific and Technical Cooperation in Earthquake
Studies, November 1999
|
- Static
and Dynamic Re-analyses of Karapiro Dam.
Report to Mighty River Power (formerly Electric
Company of New Zealand), Hamilton, New Zealand, May 1997
|
- Evaluation
of Theoretical, Seismically Caused, Vertical Contraction Joint Opening
for Brush Creek and Slab Creek Dams.
Report to Sacramento Municipal Utility District,
Sacramento, California, January 1996
|
- Sensitivity
Earthquake Analysis of Brush Creek Dam.
Report to Sacramento Municipal Utility District,
Sacramento, California, April 1994
|
- Sensitivity
Earthquake Analysis of Slab Creek Dam.
Report to Sacramento Municipal Utility District,
Sacramento, California, April 1994
|
- Experimental
Study of Dongjiang Dam for Dam-Water-Foundation Interaction.
Final
report to the US National Science Foundation on Research Conducted Under
the US-China Protocol for Scientific and Technical Cooperation in Earthquake
Studies, July 1993
|
- Nonlinear
Earthquake Analysis of Portugues Dam. Report
to the US Army Corps of Engineers, Jacksonville District, June 1991
|